This Contract is a measure and value contract for the following area: • HAAST – The installation of approximately 250m of 125mm Blue PE 100 SDR11 Watermains pipe and associated fittings and connections. • HAAST – The installation of approximately 190m of 63 mm Blue MDPE Medium Density PE Water Main Pipe, associated fittings and connections.
Date limite
10.03.2025
Publié
27.11.2025
Attribué
27.11.2025
Livingstone Street Stormwater Renewal
Clôturé·Jul 23
Hokitika Pool Heating System Upgrade
Attribué·May 6
18-19-08 Arahura Water Treatment Plant
Attribué·Apr 17
South Westland Solid Waste and Recycling Services
Attribué·Mar 26
Ross Swimming Pool Renovation 25-26-06
Attribué·Mar 26
WCWT New Totara River Bridge RFP
Attribué·Nov 27
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Ouvert aux offres·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Ouvert aux offres·Oct 25
Water and Wastewater Assets Valuation
Ouvert aux offres·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Ouvert aux offres·Oct 18
Water Mains Resilience Phase Three
Ouvert aux offres·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Ouvert aux offres·Oct 18
Main Contractor for Block E (Music Suite) Roof & Wall Recladding at Maruawai College
Ouvert aux offres·Nov 1
Main Contractor for Roofing Refurbishment at Avalon School (Wellington)
Ouvert aux offres·Nov 1
Notice of Information - Napier City Council Tender Dates Over Holiday Season
Ouvert aux offres·Nov 1
Howick Fire Station
Ouvert aux offres·Nov 1
SCI_2600812 High Stage Rating Curve Modelling
Ouvert aux offres·Nov 1
Kelburn Viaduct Safety Screens
Ouvert aux offres·Nov 1
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.