Selwyn District Council (SDC) is seeking submission from contractors to provide construction services for the Two Chain/Wards/Jones Road intersection realignment and KiwiRail Level Crossing upgrade project, located to the north of Rolleston town centre. This project forms part of the broader Rolleston Access Improvements (RAI) initiative and coincides with construction of the SH1/Rolleston Drive new Overpass to the east of this intersection. Our goal is to make the intersection and Level Rail Crossing safer, aligned with the projected traffic usage and to better cater for future growth in the area. The objective is to carryout construction within the timeframe highlighted in this tender document, minimise impact on Rolleston residents, and coordinate with the nearby construction of the new SH1 /Rolleston Drive Overpass to the east. The existing intersection has a significant number of services located under the carriageway, grass verges and rail crossing as well as overhead power services. The proposed works include the construction of an upgraded Rail Crossing, road pavement, footpath, drainage, streetlights, service and water race relocations, landscaping, signs and line marking, and streetlights to accommodate the work. Scope of Works This project consists of upgrades to Two Chain/Wards/Jones Road intersection realignment and KiwiRail Level Crossing. The contract works will consist of: • Site Clearance • Temporary Traffic Management • Earthworks • Stormwater Drainage • Water Race replacement • Pavements and Surfacing • Utility Service relocation including undergrounding of overhead power • Traffic Services • KiwiRail corridor construction including rail crossing upgrade • Landscaping
Publié
02.08.2026
Ouvert aux offres
02.08.2026
Date limite
01.10.2026
Wairoa Airport Runway Extension
14650 - SH1 Ocean Beach Resilience Project - Implementation - Advance Notice
14363 - SH6 Cromwell to Kingston Resilience - PW
15007 - SH6 Inangahua Slip - PW
13965 - Coal Creek Overbridge - PW
HPMV Bridge Strengthening: Oruru Bridge E36
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». Tous droits réservés.