Otnox
NZNouvelle-Zélande·Acheteur: Selwyn District Council

Feasibility Study - 24 Millpond Lane

Clôturé·6 sept. 2026

The Buyer requires a multi-discipline feasibility study covering three development options: Option A1 (residential subdivision with reserve enhancement, maximising yield under the current Medium Residential Sub-zone framework); Option A2 (as A1 but tested against multi-storey attached typologies such as terraces, triplexes, and townhouses); and Option B (cleared site sale with development conditions). The study must assess each option’s technical feasibility, achievable residential yield, consenting pathway, and development costs, and produce a comparative summary suitable for inclusion in a formal Business Case.

Publié

06.09.2026

Ouvert aux offres

06.09.2026

Date limite

25.09.2026

Otnox

Trouvez les appels d’offres auxquels il vaut la peine de répondre.

Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.

  • Documents de l’appel d’offresConsultez les fichiers disponibles dans un seul espace de travail.
  • Exigences et risquesDemandez une analyse des documents avec des références aux sources.
  • Votre sélection d’appels d’offresPoursuivez avec les marchés et secteurs choisis.