Otnox
UKRoyaume-Uni·Acheteur: MINING REMEDIATION AUTHORITY

Battery Energy Storage Systems (BESS)

Attribué·18 mars 2026·GBP 296,929

The Mining Remediation Authority (MRA) is seeking a contractor to provide battery energy storage solutions for two of our Mine Water Treatment Schemes (MWTS) where solar PV systems are already installed. For each site, the costs for the following items was requested: • Battery Energy Storage System(s) (BESS) • Battery Energy Management System (BEMS) • Replacement of existing solar PV inverters where required to ensure compatibility with the retrofitted BESS. Additional information: We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). CCS DMR Framework - Lot 2.1 - Procurement of Battery Energy Storage CCS DMR Framework Ref: DMR-45213-2025

Date limite

26.01.2026

Publié

18.03.2026

Attribué

18.03.2026

Otnox

Trouvez les appels d’offres auxquels il vaut la peine de répondre.

Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.

  • Documents de l’appel d’offresConsultez les fichiers disponibles dans un seul espace de travail.
  • Exigences et risquesDemandez une analyse des documents avec des références aux sources.
  • Votre sélection d’appels d’offresPoursuivez avec les marchés et secteurs choisis.