Supply, implementation and support of replacement server core and WAN switching infrastructure, including hardware, software licences, maintenance and associated professional services to maintain a secure, resilient and supported network environment. The procurement was compliantly carried out utilising the Everything ICT Framework managed by WCL (UK) Ltd.
Publié
09.10.2026
Attribué
09.10.2026
Sharnberry Mine Water Treatment Scheme (MwTS) Design & Build - Phase One
Attribué·Oct 30
IT Hardware Call Off
Attribué·Aug 7
Board Management Tool Software
Attribué·Jun 29
Nent Haggs Compound Reinstatement
Attribué·Jun 3
NEC4 ECC Project Manager, ECC Supervisor, Commercial Manager & Environmental Clerk of Works (ECoW) for the Dylife project
Attribué·Jun 1
Employee Safety App & Devices
Attribué·Apr 28
Cumberland Network - Branch Site Switches and Access Points (ex-Cumbria CC)
Attribué·Oct 5
Network Projects Kit
Attribué·Sep 25
High performance network hardware - A call off from JISC awarded framework agreement Proc2719 for Network Solutions
Attribué·Sep 24
Lab Switch Refresh
Attribué·Sep 22
PAHT - Cisco Estates Switches
Attribué·Sep 21
Firewalls Requirement for NHS England
Attribué·Sep 21
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.