Loading Otnox...
Otnox
NZUusi-Seelanti·Ostaja: Westland District Council

WCWT New Totara River Bridge RFP

Myönnetty·27 marras 2025

A.1.2 Invitation to Submit Proposal On behalf of the Principal, we are inviting proposals to design and construct the works of the above-named Contract. The Contract Works include design and construction of a new Totara River Suspension Bridge for use by cyclists and pedestrians, and a light maintenance vehicle, and are described in more detail below. Proposals for the Contract must be prepared and submitted in accordance with the conditions of proposals in A.2. A valid proposal requires the submission of the items in the checklist in B.1 signed where indicated by an authorised representative of the proposer.

Määräaika

17.10.2025

Julkaistu

27.11.2025

Myönnetty

27.11.2025

Otnox

Löydä hankinnat, joihin kannattaa osallistua.

Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.

  • Hankinta-asiakirjatTarkastele saatavilla olevia tiedostoja yhdessä työtilassa.
  • Vaatimukset ja riskitTilaa asiakirja-analyysi, jossa on viitteet lähteisiin.
  • HankintavalikoimasiJatka valitsemillasi markkinoilla ja toimialoilla.