The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Julkaistu
06.05.2026
Myönnetty
06.05.2026
Livingstone Street Stormwater Renewal
Suljettu·Jul 23
18-19-08 Arahura Water Treatment Plant
Myönnetty·Apr 17
South Westland Solid Waste and Recycling Services
Myönnetty·Mar 26
Ross Swimming Pool Renovation 25-26-06
Myönnetty·Mar 26
Haast Watermains Upgrade
Myönnetty·Nov 27
WCWT New Totara River Bridge RFP
Myönnetty·Nov 27
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.