The present location of the Scarborough 1 Pump Station (PS1060) is exposed to Rockfall (boulder roll) hazard. Although the building was not damaged by rockfall during the Canterbury Earthquake Sequence (CES), one boulder came to rest against the back wall, and several other nearby boulders rolled far enough that they would have impacted the building if their trajectory had been in line with it. The CCC Technical Services team completed a Rockfall Hazard Assessment to establish the likely medium-to-long-term risk to the existing pump station due to rockfall, and to consider what remediation methods may be suitable to mitigate the risk.
Määräaika
20.03.2026
Julkaistu
21.04.2026
Myönnetty
21.04.2026
Wainui Public Toilet Block & Wastewater Renewal
Avoinna tarjouksille·Oct 28
Request for Information (RFI) for Washington Way Skate Park Vertical Skate Ramp
Avoinna tarjouksille·Oct 28
Hybrid Delivery Model (HDM) 3.0 Consultancy Services Panel
Avoinna tarjouksille·Oct 22
Turanga Level 1 & 4 Alterations
Avoinna tarjouksille·Oct 8
Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC)
Avoinna tarjouksille·Oct 5
Burwood Landfill Site C : Provision of Plant hire, maintenance and operation of Burwood Landfill
Avoinna tarjouksille·Oct 5
Hikurangi Skatepark and Civil Construction
Avoinna tarjouksille·Oct 27
Turanga Level 1 & 4 Alterations
Avoinna tarjouksille·Oct 8
NBL Northern end works
Suljettu·Oct 2
P2026-611 Hastings War Memorial Library Seismic Upgrades & Refurbishments
Myönnetty·Jun 1
Stormwater Cave Rock Outlet Structure Renewal (Sumner)
Myönnetty·May 14
New Retaining Walls – Whitewash Head Road
Myönnetty·Apr 14
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.