The work at Turanga library includes: Level 1 (Hapori): Removal of Playdrum and construction of New Imagination Station (deconstruction of the old); adjustments to the Babychange room; adjustment to the Book Tree; New bespoke seating; Electrical and data installations. Level 4 (Auahatanga): Modifications to the Creative/Production Studio including mechanical ventilation and extraction systems; New flooring to the Recreation space; adjustment to lockers; and Electrical and data installations. Works need to be staged and timed to minimise disruption to Library services.
Julkaistu
08.10.2026
Avoinna tarjouksille
08.10.2026
Määräaika
03.11.2026
Wainui Public Toilet Block & Wastewater Renewal
Avoinna tarjouksille·Oct 28
Request for Information (RFI) for Washington Way Skate Park Vertical Skate Ramp
Avoinna tarjouksille·Oct 28
Hybrid Delivery Model (HDM) 3.0 Consultancy Services Panel
Avoinna tarjouksille·Oct 22
Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC)
Avoinna tarjouksille·Oct 5
Burwood Landfill Site C : Provision of Plant hire, maintenance and operation of Burwood Landfill
Avoinna tarjouksille·Oct 5
NBL Northern end works
Suljettu·Oct 2
Hikurangi Skatepark and Civil Construction
Avoinna tarjouksille·Oct 27
NBL Northern end works
Suljettu·Oct 2
P2026-611 Hastings War Memorial Library Seismic Upgrades & Refurbishments
Myönnetty·Jun 1
Stormwater Cave Rock Outlet Structure Renewal (Sumner)
Myönnetty·May 14
Water Supply PS1060 Scarborough 1 - Rockfall Mitigation
Myönnetty·Apr 21
New Retaining Walls – Whitewash Head Road
Myönnetty·Apr 14
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.