The South Taranaki District Council (STDC) proposes to renew an existing section of wastewater pipeline located in Tayler Street, Eltham. The pipeline has been identified for renewal following CCTV inspection and condition assessment, which confirmed that the asset is in poor structural condition with multiple cracks and dips. Due to the extent of deterioration, the pipeline is not suitable for relining and requires full replacement. The replacement pipeline is proposed to be installed at the same alignment and grade as the existing infrastructure to maintain hydraulic performance and continuity of service. Given the age and condition of the asset, the recommended construction methodology is open trench excavation. Ground conditions are currently unknown and will be managed during construction. The section in Tayler Street, Eltham is proposed for renewal of the existing wastewater pipeline: • Between ELWWMH00715 and ELWWMH00720, renewal of approximately 113 m of Ø150 mm wastewater pipeline, replacing the existing Ø150 mm earthen clay pipe with SN16 DN150 uPVC. A new 1050 mm diameter manhole will be constructed to replace the existing lamphole. The new manhole will be installed approximately 80 m downstream of existing manhole ELWWMH00715, as the existing lamphole is approximately 112 m from ELWWMH00715 and does not comply with current spacing standards.
Julkaistu
06.09.2026
Avoinna tarjouksille
06.09.2026
Määräaika
02.10.2026
South Taranaki District Council Footpath Replacements 2026/27
Suljettu·Aug 27
Waimate West Water Supply Reticulation Renewal (Palmer Road)
Suljettu·Aug 17
King Edward Street, Eltham Construction of Open Drain
Suljettu·Aug 10
Hunter Street Water Supply Pipe Renewal
Suljettu·Jul 27
South Road Wastewater Pipe Renewal (Hāwera)
Suljettu·Jul 26
C24/27 Karahaki Road Shoulder Widening
Myönnetty·Jul 4
CON640/822: Maraetai Road Stormwater Improvements
Avoinna tarjouksille·Oct 21
Ardwick Street Wastewater Renewal
Suljettu·Aug 21
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Suljettu·Aug 13
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Suljettu·Aug 3
Hunter Street Water Supply Pipe Renewal
Suljettu·Jul 27
Contract 917 Richardson Upgrades/Renewals for Pipelines - Moffat Road
Suljettu·Jul 24
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.