The South Taranaki District Council (STDC) proposes to renew sections of the water supply reticulation network along Hunter Street, Hawera, between Waihi Road (SH3) and South Road (SH45), to address aging asbestos cement (AC) pipelines and maintain required levels of service. The works include the decommissioning, or abandonment of approximately 618 m of existing DN100 AC water mains and the replacement with new DN180 HDPE pipelines. In addition to the main renewal works, rider mains will be installed to service properties where required. These rider mains will be constructed using DN63 HDPE pipe to provide an efficient alternative to individual service crossings. The scope of works includes the supply and installation of all necessary valves, fittings, fire hydrants (PN16 or higher), and service connections, along with integration into the existing network and recently installed valves and fittings to ensure continuity of supply, including maintaining service to critical customers such as the nearby hospital. The new pipelines will be installed using open trenching methods, adapted to suit site conditions, traffic management requirements, and existing underground services. The works also include flushing, pressure testing, disinfection, and commissioning of the new water mains prior to being placed into service. Additional deliverables include full reinstatement of all disturbed surfaces (including roads, berms, footpaths, and pavement markings), and the provision of as-built drawings, asset data, componentisation records, and supporting QA documentation in accordance with Council requirements to support asset management and future maintenance.
Julkaistu
27.07.2026
Avoinna tarjouksille
27.07.2026
Määräaika
10.09.2026
Tayler Street Wastewater Pipe Renewal (Eltham)
Suljettu·Sep 6
South Taranaki District Council Footpath Replacements 2026/27
Suljettu·Aug 27
Waimate West Water Supply Reticulation Renewal (Palmer Road)
Suljettu·Aug 17
King Edward Street, Eltham Construction of Open Drain
Suljettu·Aug 10
South Road Wastewater Pipe Renewal (Hāwera)
Suljettu·Jul 26
C24/27 Karahaki Road Shoulder Widening
Myönnetty·Jul 4
CON640/822: Maraetai Road Stormwater Improvements
Avoinna tarjouksille·Oct 21
Tayler Street Wastewater Pipe Renewal (Eltham)
Suljettu·Sep 6
Ardwick Street Wastewater Renewal
Suljettu·Aug 21
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Suljettu·Aug 13
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Suljettu·Aug 3
Contract 917 Richardson Upgrades/Renewals for Pipelines - Moffat Road
Suljettu·Jul 24
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.