SR 400 MVA 400 kV Power Transformer (Synthetic Ester Oil) and 63 MVAr 21 kV Variable Shunt Reactor (VSR) Synthetic Ester Oil-Immersed Helen Sähköverkko Oy is building new 400 kV substation in Sörnäinen, Helsinki Finland. Subject of the procurement is delivery of power transformer and VSR reactor for Helen Sähköverkko Oy. Intended delivery of power transformer and VSR reactor is year 2030. With this invitation to participate Helen Sähköverkko Oy is looking for capable and interested candidates to deliver the needed power transformer and VSR reactor. The delivery of power transformer and VSR reactor, including all needed transportation and erections, will be performed as turnkey deliveries. The transformer and VSR reactor deliveries will be separate from the substation construction project performed by other contractors, however, there is a need to coordinate the delivery with the construction work at site. Delivery of 400 / 400 / 125 MVA, 410 ± 6 x 1,33 % / 120 / 21 kV power transformer (Synthetic Ester Oil), equipped with on-load tap-changer, including: - Manufacturing of transformer with fittings and accessories - Testing - All necessary logistics e.g. - Sea transportation to Finland - Loading and unloading on the railway cart - Loading and unloading on road truck and transport to the site - Supplier may choose the means and route of transportation - All organizational work needed for logistics: arrangement of transportation from factory to site, customs clearance and forwarding - Unloading on the foundation - Erection, testing and commissioning at site. Delivery of 63 MVAr 21 kV Variable Shunt Reactor (VSR) Synthetic Ester Oil-Immersed including: - Manufacturing of reactor with fittings and accessories - Testing - All necessary logistics e.g. - Sea transportation to Finland - Loading and unloading on the railway cart - Loading and unloading on road truck and transport to the site - Supplier may choose the means and route of transportation - All organizational work needed for logistics: arrangement of transportation from factory to site, customs clearance and forwarding - Unloading on the foundation - Erection, testing and commissioning at site.,
Julkaistu
08.10.2026
Avoinna tarjouksille
08.10.2026
Määräaika
23.10.2026
LOPULLINEN TARJOUSPYYNTÖ: 118/21 kV, 25/31,5 MVA päämuuntajien toimitus ja asennus yhteishankintana (vain osallistumispyynnöllä menettelyyn mukaan valitut osallistujat)
Avoinna tarjouksille·Oct 13
LOPULLINEN TARJOUSPYYNTÖ: Kauttuan 118/21 kV, 31,5 MVA päämuuntajan toimitus ja asennus (vain aiemmin menettelyyn mukaan valitut osallistujat)
Myönnetty·Oct 2
Sähköaseman päämuuntaja 117 / 21 kV, 31,5MVA ONAN (40MVA ONAF)
Myönnetty·Sep 6
Sähköasemien reaktoreiden hankinta 2027-2029
Avoinna tarjouksille·Sep 6
Päämuuntajat, Ristinummen ja Vähänkyrön sähköasemille, Vaasan Sähköverkko Oy
Myönnetty·Jul 9
LOPULLINEN TARJOUSPYYNTÖ: Kauttuan 118/21 kV, 31,5 MVA päämuuntajan toimitus ja asennus (vain aiemmin menettelyyn mukaan valitut osallistujat)
Suljettu·Jul 7
Uusi sähkökäyttöinen kappaletavaranosturilla ja koukkulaitteella varustettu 4-akselinen kuorma-auto sekä 6-akselinen vaihtolavaperävaunu
Myönnetty·Oct 17
Sähköimujärjestelmät
Myönnetty·Oct 17
Iniön ruokapalvelut ja siivouspalvelut
Myönnetty·Oct 17
Tähystystutkimukset (colonoskopia ja gastroskopia) SOITE
Avoinna tarjouksille·Oct 17
Tietoliikennepalveluiden hankinta
Myönnetty·Oct 17
Keräyspaperin, tietoturvamateriaalin sekä SER-jätteen poistopalvelun hankinta
Avoinna tarjouksille·Oct 17
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.