Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. the scope for the Cultural Heritage surveys will include but not limited to: - Geophysical surveys: magnetometry, Caesium magnetometry, ground penetrating radar, earth resistance, electromagnetic, electrical resistivity tomography, - Metal detector survey - Surface artefact collection Note there is no additional scope information at this time.
Julkaistu
26.05.2026
Avoinna tarjouksille
26.05.2026
Määräaika
02.06.2026
Kier Infrastructure - UXO Site Surveys
Suljettu·Sep 28
Kier Infrastructure - Engineering Bridge Structural Survey
Suljettu·Sep 16
Kier Infrastructure - Cultural Heritage Surveys
Suljettu·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Suljettu·May 26
Kier Infrastructure - Water Environment Surveys
Suljettu·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Suljettu·May 26
Bat Surveys and Licencing 2026
Myönnetty·Jun 9
Kier Infrastructure - Cultural Heritage Surveys
Suljettu·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Suljettu·May 26
Kier Infrastructure - Water Environment Surveys
Suljettu·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Suljettu·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Suljettu·May 26
Infrastructure Connection Design Support - Pathology Lab
Myönnetty·Oct 30
Provision of Pre-Paid Cards
Myönnetty·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Myönnetty·Oct 30
Business Travel Services
Myönnetty·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Myönnetty·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.