Loading Otnox...
Otnox
UKYhdistynyt kuningaskunta·Ostaja: Kier Infrastructure

Kier Infrastructure - Engineering Bridge Structural Survey

Suljettu·16 syys 2026·GBP 100,000

Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope requires the completion of structural surveys on bridges spanning roads and existing rail assets. Instructed work may include visual and dimensional surveys of assets, ground-breaking activities associated such as foundation pitting and trenching , masonry coring as well as 3D mapping of assets.

Julkaistu

16.09.2026

Avoinna tarjouksille

16.09.2026

Määräaika

22.09.2026

Otnox

Löydä hankinnat, joihin kannattaa osallistua.

Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.

  • Hankinta-asiakirjatTarkastele saatavilla olevia tiedostoja yhdessä työtilassa.
  • Vaatimukset ja riskitTilaa asiakirja-analyysi, jossa on viitteet lähteisiin.
  • HankintavalikoimasiJatka valitsemillasi markkinoilla ja toimialoilla.