The proposed contract is for the installation of a new watermain in and around the Hawarden township in North Canterbury. Starting from the Washpen stream bridge north of Hawarden, the pipeline will run south in the road berm until it reaches the Hawarden reservoir, with twin pipes extending from the road to the reservoir. The installation will continue from Hawarden township, starting and Quinlivan Street and continuing south down O’Carrolls Road to the end of the township, connecting to existing submains and property connections along the way. The proposed pipeline will consist of approximately 2,570 metres of DN250 PE100 PN12.5, including 100 metres of DN63 PE80 PN12.5 in a shared trench and approximately 300 metres of DN125 PE100 PN12.5 connecting the main to existing network pipelines. The first section of 1950 metres of this pipeline will be in rural berm and through paddocks to the reservoir. The second section of this pipeline is through urban footpath and berm of Hawarden, including road crossings and property connections.
Määräaika
03.05.2025
Julkaistu
25.02.2026
Myönnetty
25.02.2026
A32 River Road Bridge Replacement
Avoinna tarjouksille·Oct 27
Amberley Footpath Renewals
Avoinna tarjouksille·Oct 19
Waipara & Amberley Footpath Renewals
Myönnetty·Apr 17
HDC23-012 Loburn Watermain
Myönnetty·Feb 25
HDC 24-036 SH7A Flax Stream Culvert Upgrade
Myönnetty·Feb 25
HDC 25-015 Cheviot Wastewater Renewal
Myönnetty·Dec 18
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Avoinna tarjouksille·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 25
Water and Wastewater Assets Valuation
Avoinna tarjouksille·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Avoinna tarjouksille·Oct 18
Water Mains Resilience Phase Three
Avoinna tarjouksille·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Avoinna tarjouksille·Oct 18
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.