The Principal (Hurunui District Council) is looking for a suitably qualified Contractor to undertake the replacement of the existing A32 River Road bridge with a new 36.5m long 3‑span steel concrete composite structure constructed on the same alignment as the existing structure
Julkaistu
27.10.2026
Avoinna tarjouksille
27.10.2026
Ehdot päivitetty
27.10.2026
Määräaika
02.12.2026
Amberley Footpath Renewals
Avoinna tarjouksille·Oct 19
Waipara & Amberley Footpath Renewals
Myönnetty·Apr 17
HDC23-012 Loburn Watermain
Myönnetty·Feb 25
HDC 24-035 Hawarden Watermain
Myönnetty·Feb 25
HDC 24-036 SH7A Flax Stream Culvert Upgrade
Myönnetty·Feb 25
HDC 25-015 Cheviot Wastewater Renewal
Myönnetty·Dec 18
Yarrow/Isabella & Tramway/Elles Traffic Signals
Avoinna tarjouksille·Oct 15
Road Maintenance Contract
Avoinna tarjouksille·Oct 14
HDC1604_001 Waihi Main Street Flagpoles
Suljettu·Oct 6
Contract 1117: Kakanui River Road Pavement Rehabilitation
Suljettu·Sep 29
RFT 26-042 Blomfield Street Pavement Rehab
Suljettu·Sep 23
ODC Contract 286: Ōpōtiki Netball Court Upgrade 2026
Suljettu·Aug 3
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.