Skilled resources are required to provide animal pest control of stoats by servicing a network of DOC 200/150 kill traps covering approximately 16,000 hectares in the Haast area. The network consists of 180km of tracks divided into 33 trap lines, with no more than 1159 tunnel boxes containing approximately 2300 DOC 200 or DOC 150 type traps. The contract is being issued for trapping within and around the Haast Tokoeka Kiwi Sanctuary. The sanctuary is located along the Haast-Jackson Bay Road between the Waiatoto and Arawhata Rivers and extends up onto the Haast Range. The trapping areas outside of the sanctuary include an area at the toe of the Selbourne Range, the true right of the Waiatoto River. The network includes alpine traps located between 900 – 1400m and roadside traps along the part of the Haast-Jackson Bay Road, the Waiatoto River Road and the Jackson River Roads.
Julkaistu
17.07.2026
Avoinna tarjouksille
17.07.2026
Määräaika
20.08.2026
RTG Boundary Markers
Avoinna tarjouksille·Oct 29
Lake Marian Falls Track Upgrade
Avoinna tarjouksille·Oct 22
Huka Falls Upgrade Stage 1
Avoinna tarjouksille·Oct 20
Te Hiku Campsites and Day-Use Areas Management and Cleaning Services (9 months term)
Avoinna tarjouksille·Oct 4
ROI Pukapuka Inlet Remediation Works
Suljettu·Sep 11
Rakiura Track upgrade & Chocolate Swamp Boardwalk Replacement
Suljettu·Aug 27
Regulatory Support Services Panel
Avoinna tarjouksille·Oct 8
RIV_2600497 Asburton River North Branch Stopbank
Suljettu·Oct 6
2026-11193 - Mechanical Drain Cleaning (Three Packages)
Avoinna tarjouksille·Oct 4
BNB_2600566 Rakaia Gorge Biodiversity Protection
Suljettu·Sep 1
Moehau Predator Control
Suljettu·Aug 14
Veterinarian Services and Related Products
Suljettu·Aug 2
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.