This RFP relates to the procurement of an ecological restoration contractor. The key outcome that we want to achieve is targeted weed control to gain suppression/eradication of key weed species in the catchment, to protect surrounding indigenous biodiversity values and the natural character within the Rakaia Gorge catchment. This is an ongoing project where this opportunity aims to build on the previous 5 years of work. What we need We are seeking one or more contractors to control the ecological weed species identified in each year’s operational plan, with the aim of eradicating or substantially suppressing them across the Rakaia Gorge catchment. Most work is expected to use ground-based methods that minimise impacts on surrounding indigenous vegetation. Some work may require aerial control; if so, please clearly describe the proposed methods in your response.
Julkaistu
01.09.2026
Avoinna tarjouksille
01.09.2026
Määräaika
02.10.2026
2600800 Renewable Energy Development
Avoinna tarjouksille·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Avoinna tarjouksille·Oct 18
RIV_2600497 Asburton River North Branch Stopbank
Suljettu·Oct 6
Laboratory Services
Avoinna tarjouksille·Sep 27
Blue-Green Network Plan & Supporting Implementation Guidance
Suljettu·Sep 18
Greater Christchurch Future Bus Services Procurement
Suljettu·Sep 3
Regulatory Support Services Panel
Avoinna tarjouksille·Oct 8
RIV_2600497 Asburton River North Branch Stopbank
Suljettu·Oct 6
2026-11193 - Mechanical Drain Cleaning (Three Packages)
Avoinna tarjouksille·Oct 4
Moehau Predator Control
Suljettu·Aug 14
Veterinarian Services and Related Products
Suljettu·Aug 2
Haast Kiwi Sanctuary Trapping
Suljettu·Jul 17
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.