This Scheme will cover Active Travel improvements on Shadsworth Road and Haslingden Road, Blackburn, and will encompass the following: • Removal of kerbed centre islands, • Alteration to existing zebra crossing • associated electrical works, • relocation of a kerbline and widening of the footway, • footway reconstruction as necessary, • Alterations to existing AD signage, • Removal and provision of new footway markings, • Footway surface course overlay using tarmac materials or slurry seal • carriageway patching.
Määräaika
24.03.2026
Julkaistu
07.07.2026
Myönnetty
07.07.2026
Carriageway Surfacing 25/26 - Phase 4
Myönnetty·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Myönnetty·Sep 28
Carriageway Surfacing 26/27 - Phase One
Myönnetty·Sep 28
Active Travel 2026 - Phase 1
Myönnetty·Jun 10
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Myönnetty·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Myönnetty·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Myönnetty·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Suljettu·Oct 21
Thrybergh War Memorial Civil Works
Myönnetty·Oct 7
Greasbrough War Memorial Civil Works
Myönnetty·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Suljettu·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Myönnetty·Sep 11
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.