This Scheme will cover Active Travel improvements on Gorse Street and Lower Audley Street, Blackburn And will encompass the installation of an uncontrolled pedestrian crossing with a kerbed centre island, roadmarking alterations, lighting column relocation, replacement lighting columns, associated electrical works, footway reconstruction, fencing and pedestrian controls, removal of trees, traffic signal civils works and carriageway patching.
Määräaika
05.03.2026
Julkaistu
10.06.2026
Myönnetty
10.06.2026
Ehdot päivitetty
10.06.2026
Carriageway Surfacing 25/26 - Phase 4
Myönnetty·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Myönnetty·Sep 28
Carriageway Surfacing 26/27 - Phase One
Myönnetty·Sep 28
Active Travel Improvement Scheme (Phase 2)
Myönnetty·Jul 7
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Myönnetty·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Myönnetty·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Myönnetty·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Suljettu·Oct 21
Thrybergh War Memorial Civil Works
Myönnetty·Oct 7
Greasbrough War Memorial Civil Works
Myönnetty·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Suljettu·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Myönnetty·Sep 11
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.