Renewal of water supply, wastewater and minor stormwater infrastructure along Clyde Street (SH1), Balclutha. Works include watermain and wastewater pipeline renewals, associated service connections, traffic management, testing, commissioning and reinstatement works, coordinated with NZTA's planned SH1 rehabilitation programme.
Publicado
13.08.2026
Abierto para ofertas
13.08.2026
Fecha límite
28.09.2026
Tayler Street Wastewater Pipe Renewal (Eltham)
Ardwick Street Wastewater Renewal
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Hunter Street Water Supply Pipe Renewal
Contract 917 Richardson Upgrades/Renewals for Pipelines - Moffat Road
MajSC173 Westport Private Stormwater Wastewater Separation Phase 1
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Todos los derechos reservados.