Loading Otnox...
Otnox
NZNueva Zelanda·Comprador: Gore District Council

Ardwick Street Wastewater Renewal

Abierto para ofertas·21 ago 2026

Tenders are invited from suitably qualified contractors to undertake the renewal of wastewater infrastructure and upgrade of stormwater infrastructure along Ardwick Street (Separable Portion 1) and Grant Street (Separable Portion 2), including: • ~765 m of wastewater main renewal on Ardwick Street from Eccles Street (downstream) to Onslow Street (upstream); • ~60 m of stormwater main on Ardwick Street from Eccles Street (downstream) to Grant Street (upstream); • ~100 m of wastewater main renewal on Grant Street from Ardwick Street to the Grant Street cul-de-sac; and • ~85 m of stormwater main on Grant Street from Ardwick Street to the Grant Street cul-de-sac.

Publicado

21.08.2026

Abierto para ofertas

21.08.2026

Fecha límite

25.09.2026

© 2026 SIA «Vietne». Todos los derechos reservados.