This project is the refurbishment of the Ulva Island wharf structure located at Post Office Cove, Ulva Island. The key objective is to replace the existing structure with a fit for purpose wharf facility to enable safe public access/egress to and from Ulva Island over a full range of weather and tidal conditions, the works comprises: a) site establishment, preliminaries and logistics. b) demolition and removal of existing wharf structures. c) foundation piling for new wharf structure. d) abutment installations and existing ramp adjustments. e) installation of new wharf structures and stairs. f) installation of miscellaneous items such as ladders, chains fixings and signage. g) site demobilisation and clean-up.
Publicado
03.09.2026
Abierto para ofertas
03.09.2026
Fecha límite
23.10.2026
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Todos los derechos reservados.