The project consists of design, construction, supply, installation and reinstatement works and siteworks which includes but are not limited to: • development of the design documentation, building and resource consent application • submission and management of building & resource consent • supply, install and delivery of a new two pan turnkey toilet block • installation of a new water bore, pump, a housing and water supply treatment for the toilet • installation of new power, water through new water bore, sewer and stormwater service connections
Publicado
11.09.2026
Abierto para ofertas
11.09.2026
Fecha límite
09.10.2026
TWT o Putauaki - Toilet refurbishment - Block B - Boys and Girls
Advance Notice for Activity Based Costing (Software as a Service)
RFT - Main Roofing Contractor for Roofing Project at Halsey Drive School
Request for Tender - Main Contractor for D (T) Roof Replacement at Ashburton College
Main Contractor for Blocks A,B,C,E,F,G,J,M,NS,T,W,U Steel and Membrane Roof, Internal Gutters and Roof Parts Replacements at Waitakere College
Main Contractor for Blocks O,Q,R AMS and ILE Upgrade at Tuakau College
© 2026 SIA «Vietne». Todos los derechos reservados.