Ground Investigation (GI) works and associated reporting for the WQP A45 River Nene scheme. The works are being undertaken by Structural Soils under the National Highways Ground Investigation Framework and include the investigation activities and reporting requirements set out within the agreed scope and specification.
Deadline
11.08.2026
Published
13.08.2026
Awarded
13.08.2026
S30137 Microplastics Phase 4
Active
S30134 A12 A14 Copdock Interchange Gap Analysis
Active
623188 - WQP A14 Grand Union Canal - Ground Investigation
Active
HRE - BGN/5 - Bridgeton Central - High Street - Bridgeton Cross Tunnel
Active
S30132 HOTA (26-27)
Active
HRE - PKP/ - Portskewett Pier branch - Portskewett
Active
© 2026 SIA «Vietne». All rights reserved.