UKUnited Kingdom·Buyer: THE GREATER MANCHESTER COMBINED AUTHORITY

Wigan Combined Fire Station Refurbishment - Carbon Works

Awarded·24 Aug 2026·GBP 250,000

Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure. The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide control, monitoring (including energy consumption data), and analytics. • The scheme at Wigan is expected to reduce the annual carbon emissions by circa 12.5 tonnes. • The works are to be coordinated in a manner that minimises disruption to daily fire station operations and activities. • The contractor will take responsibility for the design from RIBA Stage 4b and construction RIBA Stage 5. • The formal construction programme will be issued once the formal contractor award is made. • It is proposed that the contract will be awarded on a JCT Minor Works with Contractor's Design 2024 form of contract.

Deadline

01.10.2025

Published

24.08.2026

Awarded

24.08.2026

Otnox

Find tenders worth bidding for.

Create an account to explore this tender and find similar opportunities.

  • Tender documentsReview available files in one workspace.
  • Requirements and risksRequest a document analysis with references to the sources.
  • Your tender selectionContinue with your selected markets and sectors.