The requirement is to provide a resilient MAN network connectivity for the six UCLH sites with one uplink to three distribution switches in three locations. To provide OS2 fibre from building cabinet to building cabinet using diverse links.
Deadline
10.07.2026
Published
24.08.2026
Awarded
24.08.2026
© 2026 SIA «Vietne». All rights reserved.