This contract is for the construction of the Wairoa Airport Runway Extension project. The Contract Works include, but are not limited to: •Construction of the northern runway extension and associated runway pavement works. •Widening of existing runway pavement areas and southern RESA / turn pad related works. •Earthworks, subgrade preparation, pavement construction and surfacing. •Drainage and stormwater improvements, including culvert extension, stormwater pipe installation, cesspits, concrete dish channels, swale construction, localised drainage grading and associated drainage works. •Airfield pavement marking and associated airport civil works. •Protection of the existing beacon lights. •Environmental management, erosion and sediment control, quality assurance testing, as-built records and completion documentation.
Published
16.09.2026
Open for bids
16.09.2026
Deadline
07.10.2026
14650 - SH1 Ocean Beach Resilience Project - Implementation - Advance Notice
14363 - SH6 Cromwell to Kingston Resilience - PW
15007 - SH6 Inangahua Slip - PW
13965 - Coal Creek Overbridge - PW
HPMV Bridge Strengthening: Oruru Bridge E36
P2026-741 Wastewater Growth Programme – Waipatu Local Servicing
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». All rights reserved.