Published
18.08.2026
Open for bids
18.08.2026
Deadline
24.08.2026
Upgrade Fire Alarm Control Panel & Replace Smoke and Heat Detectors (Morris, MN)
Air Handling Unit Replacement and Repairs - National Sedimentation Laboratory
Spectrolyser, Data Logger, and assorted calibrations
Service Agreement - Orbitrap Exploris 240 Mass Spectrometer and Associated Components
Annual Fire Protection/Life Safety System Inspections
NGC Quest 10 Chromatography System
Heavy Equipment Brand Name Sole Source Justification
AMEND 0001: Requirement to start a 1GB commercial circuit Intra-Europe
HOSE ASSEMBLY,NONME
TRIP DEVICE,CIRCUIT
Courier Services at Brian D. Allgood Army Community Hospital for the Department of Pathology and Pharmacy
POWER UNIT,GAS TURB, IN REPAIR/MODIFICATION OF
© 2026 SIA «Vietne». All rights reserved.