Published
10.07.2026
Open for bids
10.07.2026
Deadline
14.08.2026
E1034GXMTL Bidders names 2
Active
DREDGING AND CLEANING OF ALL DAMS IN KRIEL POWER STATION FOR A PERIOD OF 5 YEARS.
Active
Cleaning of Seepage Dam, Final Dam, North Oil Trap Dam concrete/sand removal, cleaning of Seepage Trench, hazardous waste removal and disposal at Arnot Power Station once off (6 Months).
Active
Gourikwa Fire Detection System
Active
PROVISION OF AIR HEATER AIR IN LEAKAGE TEST AND PULVERIZED FUEL SAMPLING ON COAL PIPES AT ARNOT POWER STATION FOR THE PERIOD OF FIVE (5) YEARS
Active
Supply and delivery of stationery at Tutuka Power Station for a period of five (5) years.
Active
© 2026 SIA «Vietne». All rights reserved.