The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3 Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 3 (Ranttila-Hikiä) is approx. 46 km.,
Published
30.06.2026
Awarded
30.06.2026
Deadline
30.12.2026
597959 / The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 2
Active
Verkkokartan operointi- ja sisällönhallintapalvelut
Active
ASPRI1182 Pyhänselän ja ASPRI1183 Vuolijoen 400 kV laajennukset
Active
Sisäinen kilpailutus (DPS) - Platform Support
Active
Tasevirhesäätäjä -järjestelmän ylläpitosopimuksen uusiminen
Active
Sisäinen kilpailutus (DPS) - Analytics
Active
© 2026 SIA «Vietne». All rights reserved.