TenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. TenneT is one of the largest investors in electricity grids on land and at sea in Germany. Located at the Northwest European energy crossroads, TenneT connects: North and South. Offshore and Onshore. Germany and Europe. With its approximately 5,000 employees the company builds, maintains and operates Germany's largest transmission grid with a length over 14,000 km connect-ing more than a third of the European Union’s total offshore wind capacity. Its growth is driven by a rapidly evolving electricity demand that requires a flexible and growing grid architecture. The scope of this prequalification procedure covers the supply of Intelligent Electronic Devices (IEDs) used in the areas of protection and substation control technology within extra high-voltage and high-voltage substations. These devices constitute key components of the secondary technology and are essential for ensuring the safe, reliable and efficient operation of the transmission grid. The technical requirements are based on internationally recognized substation communication protocols commonly applied in the automation and operation of electrical power systems. The primary focus of the TQS is on IEC 61850, while other relevant protocols, such as IEC 60870 5 103 and IEC 60870 5 104, are also considered where applicable. This prequalification process aims to identify Economic Operators with proven expertise in the planning, production, implementation and integration of such devices in accordance with applicable technical and regulatory requirements. Candidates receive qualification status for each of their own production sites and each technical lot. The successful completion of the qualification process depends on various factors beyond TenneT’s control. TenneT can only commit to the processing time for the individual gates. The time required to complete the questionnaires and provide the necessary documentation is the sole responsibility of the participating Economic Operators.
Published
10.06.2026
Open for bids
10.06.2026
A120 - Erichtung des Bauwerks Projekt Wahle-Mecklar Los C6
Awarded·Oct 16
Implementierung und Betrieb einer Ausschreibungsplattform für den deutschen Kapazitätsmarkt
Open for bids·Oct 15
Qualifikationssystem Entsorgung von Al-Stahl-Leiterseilen, Erdseilluftkabeln, Lichtwellenleitern und Isolatoren
Open for bids·Oct 14
ZEUS - Zentrale End User Services
Open for bids·Oct 11
Rahmenvertrag - Lieferung von Erdungs-/Kurzschließvorrichtungen und Spannungsprüfern
Open for bids·Oct 11
COSMOS - Struktur
Open for bids·Oct 11
Erneuerung Potentialschalter B-Strecke
Open for bids·Oct 17
Die im Rahmenvertrag zu erbringende Leistung umfasst die Lieferung und Inbetriebsetzung von gasisolierten, fluorfreien, Freiluft 123-kV-Leistungsschaltern (LS).
Open for bids·Oct 11
Lieferung von Trafo- und Knotendifferentialschutzgeräten inklusive Reparatur- und Serviceleistungen
Closed·Sep 1
Qualifizierungssystem für die Herstellung und Lieferung von Niederspannungsverteilungen
Closed·Jul 2
HF-Netzfilter
Closed·Jul 2
Präqualifikationsverfahren für Niederspannungsverteilungssysteme
Closed·Jun 30
Ersatzbauwerk Rader Hochbrücke inkl. Erweiterung A 7
Awarded·Oct 18
Verwertung / Vermarktung von Eisenschrott
Awarded·Oct 18
Starkstromanlagen (KG 440)
Awarded·Oct 18
ÖFS Brutvogelkartierung 2027
Awarded·Oct 18
Hilfestellung zu Konformitätsbewertung für KI-Innovationen (KI-Reallabore)
Awarded·Oct 18
REZ SW 45ind AA Hanau
Awarded·Oct 18
Create an account to explore this tender and find similar opportunities.