Published
17.06.2025
Open
17.06.2025
Deadline
01.07.2025
PROPOSED CONSTRUCTION TO COMPLETION OF A ONE STOREY CLASSROOM BLOCK WITH 2 CLASSROOMS ON THE GROUND FLOOR AND TWO ON THE FIRST FLOOR WITH A ROOF AT OLOOLUA SECONDARY SCHOOL
Active
PROPOSED CONSTRUCTION AND COMPLETION OF A STOREY CLASSROOM BLOCK PHASE 2 AT ARAP MOI PRIMARY SCHOOL
Active
PROPOSED CONSTRUCTION OF 4 CLASSROOMON GROUND AND FIRST FLOORS OF A TWO STOREY BLOCK AT ONGATA RONGAI PRIMARY SCHOOL
Active
THE PROPOSED CONSTRUCTION OF 2NO CLASSROOMS ON THE GROUND FLOOR OF A THREE STOREY BUILDING AND CONSTRUCTION OF 8 DOORS WITH A URINAL PIT LATRINE BLOCK AT HON. NGOGOYO PRIMARY SCHOOL
Active
PROPOSED CONSTRUCTION TO COMPLETION OF THREE CLASSROOMS ON AN EXISTING SLAB ON FIRST FLOOR WITH A ROOF, STAIRCASE AND CONCRETE CANOPY CONNECTING TO AN EXISTING TUITION BLOCK AT NGONG TECHNICAL AND VOCATIONAL COLLEGE
Active
PROPOSED CONSTRUCTION OF PERIMETER FENCE AND LATRINES AT HON. ODUPOI PRIMARY SCHOOL
Active
© 2026 SIA «Vietne». All rights reserved.