CANCELLATION OF SUPPLY AND DELIVERY OF LABORATORY CHEMICALS AS AND WHEN REQUIRED FOR A PERIOD OF 05 YEARS
Published
20.03.2026
Deadline
20.04.2026
TENDER VALIDITY THE SUPPLY AND DELIVERY OF BUSHINGS USING TEAP LIST PROCESS FOR IN THE GAUTENG CLUSTER ON AN AS AND WHEN REQUIRED BASIS FOR A PERIOD OF 60 MONTHS.
Active
Provision of Boiler Refractory Service Outage at Majuba Power Station for 60 months
Active
Gariep Power Station Fire Protection System
Active
The manufacture, supply, installation, commissioning, training and delivery of an 8 Ton coiling and winding machine for Distribution, Central East Cluster, KwaZulu Natal Operating Unit, New Germany Re…
Active
SUPPLY AND DELIVERY OF LUBRICANTS FOR KENDAL POWER STATION ON AN “AS AND WHEN” REQUIRED BASIS FOR A PERIOD OF 5 YEARS.
Active
Supply and delivery of electrical switchgear fuses on an as and when required “basis” for a period of 5 years (60 Months).
Active
© 2026 SIA «Vietne». All rights reserved.