To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate temporary railheads/connections to the Network Rail infrastructure, to meet the construction logistics requirements for material deliveries by rail and support the requirements of other Railway System Contractors from the Alliance. These railheads/connections require temporary rail track works that will not form part of the final permanent works. The Temporary Railhead designs required are located at: • West Ruislip (Copthall) Temporary Railhead • Chiltern South Temporary Railhead • Berkswell Temporary Railhead • Washwood Heath Temporary Connection The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer. The scope of this required design works are as follows - Track layout and geometry, Track, Track drainage, LWR and S&C hardstanding areas, gantry foundations. Potential mobilization start (soft start) in September 2026 - then estimated full start February 2027.
Published
01.05.2026
Aktīvs
01.05.2026
Deadline
15.05.2026
Specialist Rail Systems Personnel
Open for bids·Oct 28
Transport of slabs
Open for bids·Oct 21
LWR Trailer Solution
Closed·Aug 18
Temporary Works Designer - Framework
Closed·May 1
Temporary Works Designer (Track Design Railhead)
Closed·May 1
Temporary Works Designer - Framework
Closed·May 1
Specialist Rail Systems Personnel
Open for bids·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Awarded·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Awarded·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Awarded·Oct 26
Temporary Agency Staff for Drainage Engineer
Awarded·Oct 20
Technical Approval Authority - Advisor
Awarded·Sep 29
Accountancy Apprenticeships
Awarded·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Awarded·Oct 29
Transition and Exit Technical Support Service
Awarded·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Awarded·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Open for bids·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Awarded·Oct 29
Create an account to explore this tender and find similar opportunities.