The project is for a Main Building Contractor to undertake the demolition of an existing classroom that adjoins an existing building. Wafter demolition is complete the current internal wall will become a new external wall to be constructed. The works are preferred to commence 7 December 2026 and preferably complete as early as possible in term I, 2027.
Published
18.08.2026
Open for bids
18.08.2026
Deadline
07.09.2026
Main Contractor for the Toilet & Bag Bay Refurbishment at Woodleigh School
Active
Main Contractor for Recladding & Refurbishment Works to Block M, Western Heights High School Rotorua
Active
RFT - Main Building Contractor for Blocks A, C - External Cladding and Joinery Replacement at Kelburn Normal School, Kelburn, Wellington
Active
Main Contractor for Cambridge Primary - A: Roof Replacement
Active
Main Contractor for Auditorium Refurbishment and Potential Additional Requirements at Rangitoto College
Active
Kotemaori School (Hawkes Bay) - Swimming Pool Upgrade and New Filtration System
Active
© 2026 SIA «Vietne». All rights reserved.