Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of 33kV and 11kV switchgear, power transformers, protection and control systems and ancillary equipment as well as the installation of all necessary MV, LV, control, signalling, data and fibre-optic cables. All civil works are included in this project.
Published
04.09.2024
Awarded
04.09.2024
Deadline
03.10.2024
TD/T/4307/PC3/2026 (16354) ESTABLISHMENT OF A DYNAMIC PURCHASING SYSTEM (DPS) FOR TRENCHING AND CABLE LAYING WORKS (2026 to 2029) FOR ENEMALTA PLC IN AN ENVIRONMENTALLY FRIENDLY MANNER
Active
TD/T/3873/2024 (12413) - Trenching and Cable Laying works for the installation of 33kV and 11kV cables for the new Siggiewi Distribution Centre in an Environmentally-Friendly Manner (RRP)
Active
TD/T/4256/PC3/2023 (8818) - FRAMEWORK AGREEMENT FOR THE SUPPLY AND DELIVERY OF OVERHEAD LINE CONDUCTORS
Active
TD/T/4272/PC2/2024 (11903) - Transport Service Agreement for the standby Generator fleet of Enemalta in Malta and Gozo
Active
TD/T/4268/PC3/2024 (11420) - FRAMEWORK AGREEMENT FOR THE SUPPLY AND DELIVERY OF 11KV RING MAIN UNIT
Active
TD/T/3850/2024 - TRENCHING AND CABLE LAYING WORKS IN VARIOUS LOCALITIES AS PART OF THE RRP PROJECT IN AN ENVIRONMENTALLY FRIENDLY MANNER
Active
© 2026 SIA «Vietne». All rights reserved.