Loading Otnox...
Otnox
TZTanzania·Buyer: TANZANIA ELECTRIC SUPPLY COMPANY LIMITED

Supply, Installation, Testing and Commissioning and Additional of Transformers with Associated Switchgear at Matanda Substations to Relieve Overloaded Transformers

Open for bids·17 Sep 2026

Design Works, Manufacture, and Supply of 11kV Metal Clad Air Insulated Switchgear (AIS) Cubicle Complete with all Facilities for incomer Transformer with similar manufacturer for easily integration with the existing one. · Design Works, Manufacture and Supply of 11kV XLPE Copper 300mm2 Cable Single Core From Power Transformer to Cubicle Switchgear with all Termination’s Equipment and accessories (Termination Kits And Associated Accessories on Both Sides). · Design Works, Manufacture, and Supply of Earthing System to cover extended Part · Grounding Systems For All new Equipment, Rods, Conductor, Connectors and Hardware For 15MVA Transformer and 33 and 11kV Switchgear Sections, bare Copper Cable, Insulated Copper, Copper Rods, Connectors, Hardware and all accessories · Installation of outdoor Lighting System to Cover extended part · Installation, testing and commissioning of of Earthing System to cover extended part · Installation, Testing and Commissioning of RTCC Panel for existing and new Transformer complete with all Equipment and accessories. Configuration and enabling parallel operation of the new and Existing Transformer · Factory Acceptance Test For Control And Protection System - Two Engineers For Each Trip · Design Works, Manufacture and Supply of Transformer, 15MVA, 33/11kV, Complete With All Equipment And Accessories. · Installation and Testing of 11kV XLPE Copper 300mm2 Cable Single Core from Power Transformer to Cubicle Switchgear with all Termination’s Equipment and accessories (Termination Kits And Associated Accessories on Both Sides). · Installation, Testing and Commissioning of of 11kV Metal Clad Air Insulated Switchgear (AIS) Cubicle Complete with all Facilities for incomer Transformer with similar manufacturer for easily integration with the existing one. · Supply of Mandatory Spare Parts of Power Transformer HV Bushing

Published

17.09.2026

Open for bids

17.09.2026

Deadline

24.09.2026

© 2026 SIA «Vietne». All rights reserved.