Published
15.02.2018
Open for bids
15.02.2018
Deadline
18.03.2018
Drilling and Construction of Deep tube well by DTH drilling Method
Active
Supply and Delivery of 4WD Tractor- 2 No.s
Active
Supply and Delivery of 4WD Jeep (SUV), 2 No.s
Active
Hilltop Erosion Control at Mrigasthali Area
Active
Construction of Sewer Line, River Training Work, Sewerage Crossing Structure, Road Work and Miscellaneous Works along Hanumante River
Active
Supply and Delivery of Bus (26 seater)
Active
© 2026 SIA «Vietne». All rights reserved.