Loading Otnox...
Otnox
ZASouth Africa·Buyer: Limpopo - Gateway Airport Authority Limited

Supply, installation and commissioning of a 500 kVA diesel standby generator for the new terminal building at Polokwane International Airport

Closed·24 Apr 2026

Re-Advertisement Supply, Installation and Commission of 500 KVA Diesel Standby Generator for the New Terminal Building at Polokwane International Airport, including 24 months Technical Support in line with the Manufacturer Requirements

Published

24.04.2026

Open

24.04.2026

Deadline

15.05.2026

© 2026 SIA «Vietne». All rights reserved.