Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite structure carrying the M60 over the Manchester Ship Canal. The original bridge, constructed in 1960, comprised two independent deck halves formed from four longitudinal composite girders each, separated by a central reserve joint and supported by reinforced concrete bank seat abutments and hollow-column piers. The bridge was later widened between 1986 and 1989 as part of the M63 improvement works, with new edge girders and an extended deck slab added on both sides. Pre-widening investigations identified slight alkali-aggregate reactivity (AAR) in the original concrete, prompting a change in design approach. Instead of creating monolithic widened piers, the new outer supports were redesigned as independent, free-standing hollow reinforced-concrete columns founded on separate piles and connected to the original piers via link-and-pin "Pin Bearings". This configuration allowed independent vertical behaviour while constraining lateral and longitudinal movement, with the understanding that long-term monitoring and periodic bearing adjustments would be required to manage differential movements.
Deadline
08.04.2026
Published
03.07.2026
Awarded
03.07.2026
PDF Framework - A21 Robertsbridge Bypass
Active
S30134 A12 A14 Copdock Interchange Gap Analysis
Active
HRE - PKP/ - Portskewett Pier branch - Portskewett
Active
623188 - WQP A14 Grand Union Canal - Ground Investigation
Active
HRE - BGN/5 - Bridgeton Central - High Street - Bridgeton Cross Tunnel
Active
S30132 HOTA (26-27)
Active
© 2026 SIA «Vietne». All rights reserved.