Loading Otnox...
Otnox
RWRwanda·Buyer: RWANDA MANAGEMENT INSTITUTE (RMI)

Revised Electrical installation works for RMI G+2 hostels building and lighting, including the upgrade of the main Electrical Distribution System at RMI Murambi Campus for period of 4 months

Closed·5 Jan 2026·RWF 50,000,000

Deadline

10.09.2025

Published

05.01.2026

Open for bids

05.01.2026

© 2026 SIA «Vietne». All rights reserved.