Removal and replacement of the existing electrical panel boards at Cheltenham General Hospital, together with the provision of a temporary generator supply and installation of the new panel board and associated distribution board.
Published
24.07.2026
Awarded
24.07.2026
Deadline
25.07.2026
CA18455 - R9309 Ferguson House Emergency Lighting
QEHKL232 DC5 Control Panel Replacement
Replacement of DB Boards (SWQ3135,SWQ3136,SWQ3144,SWQ3164)
Barnes Z Block Distribution Board Replacement
W5007 Electric Vehicle Charging Network Infrastructure
Lindsay S and T Blocks Lighting Upgrades
© 2026 SIA «Vietne». All rights reserved.