Reconfiguring the current staff toilet block into three unisex toilets, including installation of a new hot water system. Replacement of all fixtures, fittings, partitions, linings, flooring, and associated plumbing as required.
Published
09.08.2026
Open for bids
09.08.2026
Deadline
28.08.2026
Wairarapa College (the School) – Block B Roof Replacement
Active
Main Contractor for Auditorium Refurbishment and Potential Additional Requirements at Rangitoto College
Active
Kotemaori School (Hawkes Bay) - Swimming Pool Upgrade and New Filtration System
Active
Main Contractor for Cambridge Primary - A: Roof Replacement
Active
RFT - Main Building Contractor for Blocks A, C - External Cladding and Joinery Replacement at Kelburn Normal School, Kelburn, Wellington
Active
ROI for a Main Contractor for Gym Thermal Improvements, including Asbestos Cladding Replacement & Ceiling Remediation – Western Springs College (WSC)
Active
© 2026 SIA «Vietne». All rights reserved.