Published
20.07.2026
Open for bids
20.07.2026
Deadline
10.08.2026
Reactive Maintenance Works at Balebang-Fudbang(95+450 to 104.30) and Rubdi-Maate(104.54+108.44) Section of Saljhandi-Sandhikharka-Dhorpatan Road (NH52), Arghakhanchi
Active
Reactive Maintenance Works at Narpani-Sandhikharka Section(63+000 to 83+000) of Taulihawa-Gorusinghe-Sandhikharka Road (NH51)
Active
Reactive Maintenance Works on Chandrauta Krishananagar road. (CH. 0+000to CH.20+0000)
Active
Reactive Maintenance Works on Hulaki Highway NH05, Pakadi-Taulihawa Section (CH: 591+00 To CH: 599+000), Kapilvastu
Active
Construction of Black Top Road (Double Bituminous Surface Dressing Works) with Cross Drainage Structures (Length: 0.55 Km within Ch: 5+150 and 6+500 Km) along Takihawa- Rajpur- Shivbhari- Bharatiya Sima Sadak
Active
Construction of Black Topped Road (Double Bituminous Surface Dressing Works) with Cross Drainage Structures (Length: 1.2 Km within Chainage: 3+300 to 5+000 Km) along Ma.Ra.Ma. Pipara- Pakadi- Chakarchauda Sima, Kapilvastu, Nepal
Active
© 2026 SIA «Vietne». All rights reserved.