RA355744 - Firewater Pump Replacement

Buyer: LondonEnergy (UK)

Published: 1/19/2026

Submission deadline: 1/26/2026

Status: Aktīvs

Category: Construction work

Description

Please note that this advert is for pre-tender market engagement only. Tender is scheduled to be Published via the Delta eSourcing Platform on the 26th of January 2026. Please email [email protected] to declare interest and to be included in the tender invite when it is published. A breif description of Scope below. Please find full spec attached. Within the EcoPark, there is a firewater ring main system consisting of: 1) 2 x Firewater Pumps 2) 1 x Sprinkler Header with level control (float switch start) 3) 1 x Fire Water Ring Main (with pressure-controlled start capability) 4) 40 x Isolation Valves 5) 18 x Fire Hose Points 6) 18 x Fire Hose Connections 7) 20 x Fire Hydrants 8) 1 x Crossover Pipeline (for pressure compensation - to be decommissioned and replaced with the jockey pump) The Eco Park Firewater Pump Project aims to install two new diesel firewater pumps and integrate them with the London Energy DCS system. This will enhance the control, monitoring, and visibility of the fire protection system compared to the currently installed setup. Additionally, a new jockey pump will replace the existing crossover system to maintain pressure in the Firewater Ring Main. In addition to the installation of two new firewater pumps and a jockey pump, this project requires enhanced visual, audible, and control capabilities. All components and alarms must be integrated with the SCADA system, ensuring seamless monitoring and control B) Project Scope 1) Replace the existing firewater pumps with two new diesel driven firewater pumps. Disconnection of the existing cables from the current firewater pumps and re-termination into the new firewater pump panel. Extending the existing cables via a JB or cable joint. Installation of any additional cables (to be specified and installed by the contractor). 2) Select, procure and install a new jockey pump to maintain Ring Main pressure. Installation of any additional cables (power and control) for the jockey pump. 3) Upgrade repeater panels to communicate all alarms and faults to the SCADA system. 4) Implement DCS-based control and monitoring of the firewater pumps and jockey pump through SCADA. 5) All technical documentation and drawings are to be provided to LEL by the selected contractor for upload to the London Energy SharePoint, by LEL. ? C) Control Specifications This section outlines the existing control and installation configurations, as well as the required upgrades. Existing Control and DCS Specifications (Electrical): • Auto…

Source: official portal