Quarry Road substation detailed design. The substation development will include a 33 kV switchboard, one 33/11 kV 5 MVA transformer and an 11 kV switchboard. The site will be designed to accommodate a second supply transformer. The design for this substation was substantially completed, and the project was put on hold. The bulk of the civil and structural design, as well as the primary design, is expected to be used as far as practicable. Tenderers should be aware that PowerNet’s secondary and protection design requirements have undergone significant changes since the previous design was completed. The substation design includes the following: • Bus the Halfway Bus-Palmerston 1 and 2 feeders at Quarry Road • One 33 kV/11 kV, 3.5/5 MVA ONAN/ONAF, OLTC transformer • Relocation of the ripple control from TPT Palmerston 110/33 • 33 kV and 11 kV points of connection for the mobile substation • Substation civil works, including site grading, fencing and earth grid • Communications mast • New switch room • New 11 kV Feeder cabling • Protection System • Scada System • Safety in Design Reviews • Procurement Assistance • Construction Package
Deadline
28.10.2025
Published
12.11.2025
Awarded
12.11.2025
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Closed·Aug 4
RFT - 220kV EDN GXP and 100kV Line Build Project | CIVILS
Awarded·May 29
Construction and Installation Services for Kelso and Waikaka Transformer Replacements.
Awarded·Dec 8
Main Contractor for the new PowerNet Frankton Depot
Awarded·Dec 3
Advance Notice - RFT SPF Package 10A - Electrical Integration Contractor
Open for bids·Sep 29
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Closed·Aug 4
RFP - Watercare Electricity Supply
Closed·Jul 20
P2026-777 2026 Street Light and Traffic Signal Management Contract
Awarded·May 6
Request for Proposal (RFP) Electricity Supply
Awarded·Apr 20
Health NZ Te Toka Tumai Auckland - Greenlane Clinical Centre Electrical HV Works - 2 x Prefabricated Substation Switchrooms
Awarded·Oct 5
Lake Terrace Water Treatment Plant Seismic Strengthening
Open for bids·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Open for bids·Oct 23
Advance Notice - Coronial Support Services Procurement
Open for bids·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Open for bids·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Open for bids·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Open for bids·Oct 23
Create an account to explore this tender and find similar opportunities.