Published
26.06.2026
Awarded
26.06.2026
Supply of Spare Parts for Balance of Plant Equipment at Mtwara I Gas Plant
Active
Supply,Installation,Testing and Commissioning of Containerized Water Treatment Plant at Mtwara Gas Plant
Active
Supply of Multi function Process Calibrator, Pneumatic and Hydraulic Test Pump at Mtwara II Gas Plant
Active
Repair of TM16 and TM43 Gas Turbine Package Compartment at Mtwara II Gas Plant
Active
Supply of Oils and Silica Jelly for 75MVA Power Transformer and 5MVRs Switch Yard Reactor at Mtwara II Gas Plant
Active
Supply and Installation of Plant Automatic lighting DC system at Mtwara Gas Plant
Active
© 2026 SIA «Vietne». All rights reserved.