Published
24.07.2026
Open for bids
24.07.2026
Deadline
07.08.2026
PROPOSED COMPLETION OF A THREE-STOREY BUILDING AT KIMALA SECONDARY SCHOOL (PHASE 2)
Active
Proposed construction to completion of 45No. Student Capacity Laboratory at Madarasani Primary School
Active
Proposed construction to completion of 4no. Classrooms on the first floor of a storey building at Chala Primary School.
Active
Proposed construction to completion of 4No. classrooms with ceramic tile floor finish on the ground floor of a storey building with one upper floor at Soweni Primary School.
Active
THE PROPOSED CONSTRUCTION TO COMPLETION OF 4 DOOR WITH URINAL BOYS SEPTIC LATRINE BLOCK (3 DOOR NORMAL AND 1 DOOR FOR PLWD AND URINAL AT JIPE PRIMARY SCHOOL
Active
THE PROPOSED CONSTRUCTION TO COMPLETION OF 5 DOOR GIRLS SEPTIC LATRINE BLOCK (4 DOOR NORMAL & 1 DOOR FOR PLWD) AT ZIWANI PRIMARY SCHOOL
Active
© 2026 SIA «Vietne». All rights reserved.