Published
11.06.2025
Open
11.06.2025
Deadline
18.06.2025
PROPOSED CONSTRUCTION OF A DORMITORY COMPRISING WASHROOMS,BATHROOMS FROM SUB-STRUCTURE AND GROUND FLOOR COMPLETE WITH A FOUNDATION ABLE TO SUSTAIN 2NO ADDITIONAL FLOORS AT THIKA ROAD PRIMARY AND J.S.S
Active
THE PROPOSED CONSTRUCTION TO COMPLETION OF 4NO’ CLASSROOMS; 2NO’ CLASSROOMS ON THE GROUND FLOOR WITH A SUSPENDED SLAB AND 2NO’ CLASSROOMS ON THE FIRST FLOOR SLAB WITH A RAMP AND A STAIRCASE AT GITHURAI PRIMARY AND JUNIOR SECONDSRY SCHOOL
Active
THE PROPOSED CONSTRUCTION TO COMPLETION OF A PERIMETER WALL (373M) AND INSTALLATION OF A STEEL METAL GATE AT KIWANJA SECONDARY SCHOOL
Active
THE PROPOSED CONSTRUCTION TO COMPLETION OF A PERIMETER WALL (540M) AND INSTALLATION OF A STEEL METAL GATE AT NJATHAINI JUNIOR SECONDARY SCHOOL.
Active
THE PROPOSED COMPLETION WORS OF DIGITAL HUB AT NG-CDF TOP FLOOR BUILDING HEADUARTER PHASE 11 IN ROYSAMBU CONSTITUENCY
Active
THE PROPOSED REHABILITATION TO COMPLETION OF SCHOOL SPORTSFIELD (MEASURING APPROXIMATELY 10,800 SQUARE METRE)—GRADING, DRAINAGE WORKS, LEVELING & LANDSCAPING AT GARDEN ESTATE PRIMARY AND JUNIOR SECONDSRY SCHOOL.
Active
© 2026 SIA «Vietne». All rights reserved.